The Hoagie Stop
The Hoagie Stop is a renovation/alteration project at 2719 Basswood Blvd Ste.121, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $125K across about 1,100 sq ft.
๐Project Metrics
TDLR #TABS2026001209Review Complete
Design review complete, construction may proceed
The Hoagie Stop is a Renovation/Alteration project located at 2719 Basswood Blvd Ste.121, Fort Worth, TX 76131 in Fort Worth, Texas. The project has an estimated value of $125K covering 1,100 sq ft. KUALOA RANCH INC is the property owner and Medina Designs & Consultant, Inc is the design firm of record. The project was registered with TDLR on September 18, 2025.
โFrequently Asked Questions
What is The Hoagie Stop?
The Hoagie Stop is a renovation/alteration project at 2719 Basswood Blvd Ste.121 in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Building out a take-out kitchen, 1100 SF.
Is The Hoagie Stop open in Fort Worth?
The Hoagie Stop is currently under construction in Fort Worth, TX. Its current TDLR status is "Review Complete".
Where is The Hoagie Stop located?
The Hoagie Stop is located at 2719 Basswood Blvd Ste.121, Fort Worth, TX, 76131, in Tarrant County.
Who is the owner or developer of The Hoagie Stop?
KUALOA RANCH INC is the property owner/developer of record for The Hoagie Stop, per its TDLR project registration.
Who is the architect or design firm for The Hoagie Stop?
Medina Designs & Consultant, Inc is the design firm of record for The Hoagie Stop, according to its TDLR filing.
How much does The Hoagie Stop cost and how big is it?
The Hoagie Stop has an estimated construction value of $125K and approximately 1,100 square feet (about $114/sqft), based on its TDLR filing.
๐Scope of Work
Building out a take-out kitchen, 1100 SF.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 18, 2025
Review Complete
Sep 18, 2025
Inspection Complete
Closed