FSG
FSG is a renovation/alteration project at 5611 Baird Court, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $1.7M across about 65,728 sq ft.
๐Project Metrics
TDLR #TABS2026001505Inspection Complete
Final inspection completed, awaiting project closure
FSG is a Renovation/Alteration project located at 5611 Baird Court, Houston, TX 77041 in Houston, Texas. The project has an estimated value of $1.7M covering 65,728 sq ft. Facility Solutions Group is the property owner and Lo Architecture is the design firm of record. The project was registered with TDLR on September 22, 2025.
โFrequently Asked Questions
What is FSG?
FSG is a renovation/alteration project at 5611 Baird Court in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior remodel of two-story building, additional mezzanine, and high pile
Is FSG open in Houston?
Construction on FSG is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Where is FSG located?
FSG is located at 5611 Baird Court, Houston, TX, 77041, in Harris County.
Who is the owner or developer of FSG?
Facility Solutions Group is the property owner/developer of record for FSG, per its TDLR project registration.
Who is the architect or design firm for FSG?
Lo Architecture is the design firm of record for FSG, according to its TDLR filing.
How much does FSG cost and how big is it?
FSG has an estimated construction value of $1.7M and approximately 65,728 square feet (about $25/sqft), based on its TDLR filing.
๐Scope of Work
interior remodel of two-story building, additional mezzanine, and high pile
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 22, 2025
Review Complete
Sep 22, 2025
Inspection Complete
Apr 12, 2026
Closed
202d
Construction phase