Quarry Lake II Common Area Corridor is a renovation/alteration project at 4516 Seton Center Parkway Level 3, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $300K across about 2,345 sq ft.
Final inspection completed, awaiting project closure
Quarry Lake II Common Area Corridor is a Renovation/Alteration project located at 4516 Seton Center Parkway Level 3, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $300K covering 2,345 sq ft. BR Lakeside Office Owner LLC is the property owner. The project was registered with TDLR on September 24, 2025.
Quarry Lake II Common Area Corridor is a renovation/alteration project at 4516 Seton Center Parkway Level 3 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Common area corridor and elevator lobby remodel for multi-tenant layout on previous full floor tenant space.
Construction on Quarry Lake II Common Area Corridor is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Quarry Lake II Common Area Corridor is located at 4516 Seton Center Parkway Level 3, Austin, TX, 78759, in Travis County.
BR Lakeside Office Owner LLC is the property owner/developer of record for Quarry Lake II Common Area Corridor, per its TDLR project registration.
Quarry Lake II Common Area Corridor has an estimated construction value of $300K and approximately 2,345 square feet (about $128/sqft), based on its TDLR filing.
Common area corridor and elevator lobby remodel for multi-tenant layout on previous full floor tenant space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 24, 2025
Review Complete
Feb 11, 2026
Inspection Complete
Apr 26, 2026
Closed
140d
Review duration
74d
Construction phase
Building permits found at or near this location
Addition of new D wall to create suite 330 from approx. (3426 F) of existing interior space.
Interior alteration to approx. 2213 SF of existing interior space for Suite 160
NEW `D WALL TO CREATE SUTIE 155 WITH APPROX. (1043SF) OF EXISTING INTERIOR SPACE
Addition of new demising wall to create suite 330 from approx. 1292SF of existing interior space
Interior alteration of existing space (Suite 360 approx 6508) (Suite 365 approx 1083) and new D wall to create Suite 380 (approx 2179 sf) Floor 3