GLO30
GLO30 is a renovation/alteration project at 13341 W US HIGHWAY 290, Suite 1104, Dripping Springs, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2025). The project has an estimated value of $85K across about 1,223 sq ft.
๐Project Metrics
TDLR #TABS2026002446Inspection Complete
Final inspection completed, awaiting project closure
GLO30 is a Renovation/Alteration project located at 13341 W US HIGHWAY 290, Suite 1104, Dripping Springs, TX 78620 in Dripping Springs, Texas. The project has an estimated value of $85K covering 1,223 sq ft. Erland Point MHP is the property owner and Austin Plans for Permits is the design firm of record. The project was registered with TDLR on October 2, 2025.
โFrequently Asked Questions
What is GLO30?
GLO30 is a renovation/alteration project at 13341 W US HIGHWAY 290, Suite 1104 in Dripping Springs, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of an existing shell lease space into a facial-skin care facility
Is GLO30 open in Dripping Springs?
Construction on GLO30 is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2025. The building is finished and very likely open.
Where is GLO30 located?
GLO30 is located at 13341 W US HIGHWAY 290, Suite 1104, Dripping Springs, TX, 78620, in Hays County.
Who is the owner or developer of GLO30?
Erland Point MHP is the property owner/developer of record for GLO30, per its TDLR project registration.
Who is the architect or design firm for GLO30?
Austin Plans for Permits is the design firm of record for GLO30, according to its TDLR filing.
How much does GLO30 cost and how big is it?
GLO30 has an estimated construction value of $85K and approximately 1,223 square feet (about $70/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish out of an existing shell lease space into a facial-skin care facility
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 2, 2025
Review Complete
Inspection Complete
Oct 2, 2025
Closed
๐Related Projects
๐๏ธSame Design Firm
$871K total๐Related City Permits
Building permits found at or near this location
replace prv in yard
replaced prv in yard
Express: replace siding by the front back right and left side of the house
NEW 2STRY RESID W/ATT GARAGE PORCH ELEC SRV EUD
New 2 Story Sf Resid. W/Attach. Grg & Porch - Outside The City - Eud