Stephens Inc
Stephens Inc is a renovation/alteration project at 1111 W. 6th St. Ste 420, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $450K across about 1,704 sq ft.
๐Project Metrics
TDLR #TABS2026002548Review Complete
Design review complete, construction may proceed
Stephens Inc is a Renovation/Alteration project located at 1111 W. 6th St. Ste 420, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $450K covering 1,704 sq ft. SDC Treaty Oak, LLC is the property owner and JDAI Studio is the design firm of record. The project was registered with TDLR on October 3, 2025.
โFrequently Asked Questions
What is Stephens Inc?
Stephens Inc is a renovation/alteration project at 1111 W. 6th St. Ste 420 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1704 SF for administrative offices.
Is Stephens Inc open in Austin?
Stephens Inc is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is Stephens Inc located?
Stephens Inc is located at 1111 W. 6th St. Ste 420, Austin, TX, 78701, in Travis County.
Who is the owner or developer of Stephens Inc?
SDC Treaty Oak, LLC is the property owner/developer of record for Stephens Inc, per its TDLR project registration.
Who is the architect or design firm for Stephens Inc?
JDAI Studio is the design firm of record for Stephens Inc, according to its TDLR filing.
How much does Stephens Inc cost and how big is it?
Stephens Inc has an estimated construction value of $450K and approximately 1,704 square feet (about $264/sqft), based on its TDLR filing.
๐Scope of Work
1704 SF for administrative offices.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 3, 2025
Review Complete
Oct 3, 2025
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$4.2M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work ZAVISCA
Sewer spot repair: Approximately 5 feet of repair taking place
Express: Tub to shower conversion in master replace walls in shower
Express: Tub to shower conversion in master replace walls in shower
Replacement of complete existing central heat and air system with or without duct work