24HR FLOOD PROS is a renovation/alteration project at 601 Title Dr, Lewisville, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $1.5M across about 42,141 sq ft.
Final inspection completed, awaiting project closure
24HR FLOOD PROS is a Renovation/Alteration project located at 601 Title Dr, Lewisville, TX 75056 in Lewisville, Texas. The project has an estimated value of $1.5M covering 42,141 sq ft. AR INDUSTRIAL NO. 3, LTD is the property owner and O'BRIEN ARCHITECTS is the design firm of record. The project was registered with TDLR on October 7, 2025.
24HR FLOOD PROS is a renovation/alteration project at 601 Title Dr in Lewisville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR 7,790 SQFT OFFICE SPACE ADDITION IN AN EXISTING SHELL BUILDING. RENOVATION OF 42,141 SQFT EXISTING WAREHOUSE SPACE.
Construction on 24HR FLOOD PROS is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
24HR FLOOD PROS is located at 601 Title Dr, Lewisville, TX, 75056, in Denton County.
AR INDUSTRIAL NO. 3, LTD is the property owner/developer of record for 24HR FLOOD PROS, per its TDLR project registration.
O'BRIEN ARCHITECTS is the design firm of record for 24HR FLOOD PROS, according to its TDLR filing.
24HR FLOOD PROS has an estimated construction value of $1.5M and approximately 42,141 square feet (about $36/sqft), based on its TDLR filing.
INTERIOR 7,790 SQFT OFFICE SPACE ADDITION IN AN EXISTING SHELL BUILDING. RENOVATION OF 42,141 SQFT EXISTING WAREHOUSE SPACE.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 7, 2025
Review Complete
Mar 5, 2026
Inspection Complete
May 13, 2026
Closed
149d
Review duration
69d
Construction phase