1350 Ave South Tenant Finish Out
1350 Ave South Tenant Finish Out is a renovation/alteration project at 1350 Avenue S,Suite 110, Grand Prairie, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $1.1M across about 1,965 sq ft.
๐Project Metrics
TDLR #TABS2026004827Inspection Complete
Final inspection completed, awaiting project closure
1350 Ave South Tenant Finish Out is a Renovation/Alteration project located at 1350 Avenue S,Suite 110, Grand Prairie, TX 75050 in Grand Prairie, Texas. The project has an estimated value of $1.1M covering 1,965 sq ft. LRF3 DAL AVENUE S LLC is the property owner and Method Architecture is the design firm of record. The project was registered with TDLR on October 31, 2025.
โFrequently Asked Questions
What is 1350 Ave South Tenant Finish Out?
1350 Ave South Tenant Finish Out is a renovation/alteration project at 1350 Avenue S,Suite 110 in Grand Prairie, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior office remodel 1,965 sft in an existing building
Is 1350 Ave South Tenant Finish Out open in Grand Prairie?
Construction on 1350 Ave South Tenant Finish Out is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Where is 1350 Ave South Tenant Finish Out located?
1350 Ave South Tenant Finish Out is located at 1350 Avenue S,Suite 110, Grand Prairie, TX, 75050, in Tarrant County.
Who is the owner or developer of 1350 Ave South Tenant Finish Out?
LRF3 DAL AVENUE S LLC is the property owner/developer of record for 1350 Ave South Tenant Finish Out, per its TDLR project registration.
Who is the architect or design firm for 1350 Ave South Tenant Finish Out?
Method Architecture is the design firm of record for 1350 Ave South Tenant Finish Out, according to its TDLR filing.
How much does 1350 Ave South Tenant Finish Out cost and how big is it?
1350 Ave South Tenant Finish Out has an estimated construction value of $1.1M and approximately 1,965 square feet (about $580/sqft), based on its TDLR filing.
๐Scope of Work
Interior office remodel 1,965 sft in an existing building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 31, 2025
Review Complete
Oct 31, 2025
Inspection Complete
Apr 8, 2026
Closed
159d
Construction phase