INHAUS is a renovation/alteration project at 17221 ALDINE WESTFIELD ROAD, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $191K across about 26,000 sq ft.
Final inspection completed, awaiting project closure
INHAUS is a Renovation/Alteration project located at 17221 ALDINE WESTFIELD ROAD, Houston, TX 77073 in Houston, Texas. The project has an estimated value of $191K covering 26,000 sq ft. URBAN ALDINE, LP is the property owner and Urban Construction SW is the design firm of record. The project was registered with TDLR on November 18, 2025.
INHAUS is a renovation/alteration project at 17221 ALDINE WESTFIELD ROAD in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NEW TI OFFICE SPACE - 26.000 SF BUILD-OUT OF TEMP CONTROLLED MANUFACTURING SPACE FOR A FLOOR SURFACT PRODUCTS COMPANY, IN AN EXISTING SHELL BUILDING.
Construction on INHAUS is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.
INHAUS is located at 17221 ALDINE WESTFIELD ROAD, Houston, TX, 77073, in Harris County.
URBAN ALDINE, LP is the property owner/developer of record for INHAUS, per its TDLR project registration.
Urban Construction SW is the design firm of record for INHAUS, according to its TDLR filing.
INHAUS has an estimated construction value of $191K and approximately 26,000 square feet (about $7/sqft), based on its TDLR filing.
NEW TI OFFICE SPACE - 26.000 SF BUILD-OUT OF TEMP CONTROLLED MANUFACTURING SPACE FOR A FLOOR SURFACT PRODUCTS COMPANY, IN AN EXISTING SHELL BUILDING.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 18, 2025
Review Complete
Mar 17, 2026
Inspection Complete
Mar 25, 2026
Closed
119d
Review duration
8d
Construction phase