MH MEIC PEARLAND CT is a renovation/alteration project at 16100 South Freeway, Pearland, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $250K across about 525 sq ft.
Final inspection completed, awaiting project closure
MH MEIC PEARLAND CT is a Renovation/Alteration project located at 16100 South Freeway, Pearland, TX 77584 in Pearland, Texas. The project has an estimated value of $250K covering 525 sq ft. MEMORIAL HERMANN HEALTH SYSTEMS is the property owner. The project was registered with TDLR on November 25, 2025.
MH MEIC PEARLAND CT is a renovation/alteration project at 16100 South Freeway in Pearland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THE REPLACEMENT OF CT IMAGING EQUIPMENT INSTALLATION AND MINOR RENOVATION OF AN EXISTING CT ROOM AND CONTROL ROOM. THIS INCLUDES NEW EQUIPMENT, NEW FINISHES AND INFRASTRUCTURE MODIFICATIONS TO SUPPORT THE NEW EQUIPMENT AND ITS REQUIREMENTS
Construction on MH MEIC PEARLAND CT is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
MH MEIC PEARLAND CT is located at 16100 South Freeway, Pearland, TX, 77584, in Brazoria County.
MEMORIAL HERMANN HEALTH SYSTEMS is the property owner/developer of record for MH MEIC PEARLAND CT, per its TDLR project registration.
MH MEIC PEARLAND CT has an estimated construction value of $250K and approximately 525 square feet (about $476/sqft), based on its TDLR filing.
THE REPLACEMENT OF CT IMAGING EQUIPMENT INSTALLATION AND MINOR RENOVATION OF AN EXISTING CT ROOM AND CONTROL ROOM. THIS INCLUDES NEW EQUIPMENT, NEW FINISHES AND INFRASTRUCTURE MODIFICATIONS TO SUPPORT THE NEW EQUIPMENT AND ITS REQUIREMENTS
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 25, 2025
Review Complete
Jan 15, 2026
Inspection Complete
May 7, 2026
Closed
51d
Review duration
112d
Construction phase