FM 76 (CSJ: 0674-01-083)
FM 76 (CSJ: 0674-01-083) is a renovation/alteration project at From: Delta Dr To: Rose Ln, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $1.5M across about 14,424 sq ft.
๐Project Metrics
TDLR #TABS2026007131Review Complete
Design review complete, construction may proceed
FM 76 (CSJ: 0674-01-083) is a Renovation/Alteration project located at From: Delta Dr To: Rose Ln, El Paso, TX 79915 in El Paso, Texas. The project has an estimated value of $1.5M covering 14,424 sq ft. TxDOT District: El Paso is the property owner. The project was registered with TDLR on December 3, 2025.
โFrequently Asked Questions
What is FM 76 (CSJ: 0674-01-083)?
FM 76 (CSJ: 0674-01-083) is a renovation/alteration project at From: Delta Dr To: Rose Ln in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: ADA improvements including pedestrian sidewalks, curb ramps and traffic signals.
Is FM 76 (CSJ: 0674-01-083) open in El Paso?
FM 76 (CSJ: 0674-01-083) is still under construction in El Paso, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is FM 76 (CSJ: 0674-01-083) located?
FM 76 (CSJ: 0674-01-083) is located at From: Delta Dr To: Rose Ln, El Paso, TX, 79915, in El Paso County.
Who is the owner or developer of FM 76 (CSJ: 0674-01-083)?
TxDOT District: El Paso is the property owner/developer of record for FM 76 (CSJ: 0674-01-083), per its TDLR project registration.
How much does FM 76 (CSJ: 0674-01-083) cost and how big is it?
FM 76 (CSJ: 0674-01-083) has an estimated construction value of $1.5M and approximately 14,424 square feet (about $104/sqft), based on its TDLR filing.
๐Scope of Work
ADA improvements including pedestrian sidewalks, curb ramps and traffic signals.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 3, 2025
Review Complete
Jan 4, 2026
Inspection Complete
Closed
32d
Review duration