Opening ~Feb 2027๐Ÿ“Review Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

Texas State Hilltop Housing Phase II

305 Mathews Street, San Marcos, TX 78666, San Marcos, TX, 78666

Texas State Hilltop Housing Phase II is a new construction project at 305 Mathews Street, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $227.6M across about 386,112 sq ft.

Construction50%

๐Ÿ“ŠProject Metrics

TDLR #TABS2026007608
$227.6M
Project Value
386,112
Square Feet
$589/sqft
Cost/SqFt
2y 1mo
Duration
Registered:Dec 10, 2025
Start:Feb 1, 2025
Target:Feb 28, 2027
Remaining:217 days
๐Ÿ“

Review Complete

Design review complete, construction may proceed

Texas State Hilltop Housing Phase II is a New Construction project located at 305 Mathews Street, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $227.6M covering 386,112 sq ft. Texas State University System is the property owner and Kirksey Architecture is the design firm of record. The project was registered with TDLR on December 10, 2025.

โ“Frequently Asked Questions

What is Texas State Hilltop Housing Phase II?

Texas State Hilltop Housing Phase II is a new construction project at 305 Mathews Street in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 386,112 SF Housing

Is Texas State Hilltop Housing Phase II open in San Marcos?

Texas State Hilltop Housing Phase II is still under construction in San Marcos, TX, with an estimated completion of Feb 2027 according to its TDLR registration.

Where is Texas State Hilltop Housing Phase II located?

Texas State Hilltop Housing Phase II is located at 305 Mathews Street, San Marcos, TX, 78666, in Hays County.

Who is the owner or developer of Texas State Hilltop Housing Phase II?

Texas State University System is the property owner/developer of record for Texas State Hilltop Housing Phase II, per its TDLR project registration.

Who is the architect or design firm for Texas State Hilltop Housing Phase II?

Kirksey Architecture is the design firm of record for Texas State Hilltop Housing Phase II, according to its TDLR filing.

How much does Texas State Hilltop Housing Phase II cost and how big is it?

Texas State Hilltop Housing Phase II has an estimated construction value of $227.6M and approximately 386,112 square feet (about $589/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

386,112 SF Housing

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
December 10, 2025
Review Complete
December 10, 2025
Construction Start
February 1, 2025
Expected Completion
February 28, 2027

๐Ÿ“…Project Timeline

Filed

Dec 10, 2025

Review Complete

Dec 10, 2025

Inspection Complete

Closed

๐Ÿ“„Related City Permits

Building permits found at or near this location

305 CAMPERDOWN ELM DR

Construct new driveway approach of 28 FT and sidewalk of 11FT 6IN with curb/gutter of 91.2ft

ActiveDriveway / SidewalksNewApr 2026
View Details
2025-159253 DS
305 S CONGRESS AVE

We will be adding mulitple panels and receptacles for tenant to put in equipment and office area. There will be no additional meter needed. 40 20A 120V. DUPLEX RECEPTACLE 7 - 20A 120V. QUADRAPLEX RECEPTACLE These 120V outlets being installed are standard NEMA 5-20 (20A 125V duplex outlets). Each will have an FLA of 10A and will be wired with #12 CU stranded wire. There are also: (5) 125A 480V equipment feeds with a safety disconnect and #1 CU wire (3) 70A 480V equipment feeds with a safety disconnect and #4 CU wire (3) 30A 208V equipment feeds with a safety disconnect and #10 CU wire

FinalElectrical PermitUpgradeApr 2026
View Details
2026-028413 EP
๐Ÿ”งC & S Enterprises
305 E 3RD ST

Replacement of mini-split system

ActiveMechanical PermitChange OutMar 2026
View Details
2023-130814 MP
๐Ÿ”ง5F Mechanical Co.
305 S CONGRESS AVE

Install new transformer and 400A sub panel Ok Per Steve Leitch. Reference 2025 146628 DA (Wiring to storage and employee restroom receptacles for cameras all on site plan. guard shack?)

FinalElectrical PermitUpgradeFeb 2026
View Details
2025-138164 EP
๐Ÿ”งRCR Telecon
305 ROWLAND DR

interior remodel - see attached document

FinalMechanical PermitAddition and RemodelJan 2026
View Details
2025-074734 MP
๐Ÿ”งELO Air Conditioning and Heating

Quick Actions

TDLR ID: TABS2026007608

Registered Accessibility Specialist

๐Ÿ“‹
MARK S,ROBINSON
RAS #1561
8213A SHOAL CREEK BLVD SUITE 102, AUSTIN, TX 78757
๐Ÿ“Š

Hays County Economy

3.6%
Unemployment
$419K
Median Listing
4,595
Bldg Permits/yr
304K
Population
1,660
Active Listings
$92K
Median Income
Source: FRED ยท Updated May 2026
County projects โ†’

Need a contractor for this project?

Browse verified general contractors active in Hays County

Find General Contractors in Hays

Get alerts for Hays

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists