Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Hays
Opening ~Feb 2027๐Ÿ“Review Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

Texas State Hilltop Housing Phase II

305 Mathews Street, San Marcos, TX 78666, San Marcos, TX, 78666
Construction50%

๐Ÿ“ŠProject Metrics

TDLR #TABS2026007608
$227.6M
Project Value
386,112
Square Feet
$589/sqft
Cost/SqFt
2y 1mo
Duration
Registered:Dec 10, 2025
Start:Feb 1, 2025
Target:Feb 28, 2027
Remaining:266 days
๐Ÿ“

Review Complete

Design review complete, construction may proceed

Texas State Hilltop Housing Phase II is a New Construction project located at 305 Mathews Street, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $227.6M covering 386,112 sq ft. Texas State University System is the property owner and Kirksey Architecture is the design firm of record. The project was registered with TDLR on December 10, 2025.

๐Ÿ“‹Scope of Work

386,112 SF Housing

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
December 10, 2025
Review Complete
December 10, 2025
Construction Start
February 1, 2025
Expected Completion
February 28, 2027

๐Ÿ“…Project Timeline

Filed

Dec 10, 2025

Review Complete

Dec 10, 2025

Inspection Complete

Closed

๐Ÿ”—Related Projects

๐Ÿ‘คSame Owner

$5.04B total
Sul Ross State University - Performing Arts Center (PAC)
Alpineยท$9.5M
Sul Ross State University - Francois Fine Arts Building
Alpineยท$4.5M
Sul Ross State University - Kokernot Amphitheater
Alpineยท$400K

๐Ÿ›๏ธSame Design Firm

$14.4M total
VoltaGrid Convenience Stair Package
Houstonยท$600K
FBC Beaumont
Beaumontยท$6.3M
NRG HQ - Level 50 Modification
Houstonยท$500K
Austin Ridge Bible Church - North Hills
Austinยท$7.0M

๐Ÿ“„Related City Permits

Building permits found at or near this location

305 CAMPERDOWN ELM DR

Construct new driveway approach of 28 FT and sidewalk of 11FT 6IN with curb/gutter of 91.2ft

ActiveDriveway / SidewalksNewApr 2026
View Details
2025-159253 DS
305 S CONGRESS AVE

We will be adding mulitple panels and receptacles for tenant to put in equipment and office area. There will be no additional meter needed. 40 20A 120V. DUPLEX RECEPTACLE 7 - 20A 120V. QUADRAPLEX RECEPTACLE These 120V outlets being installed are standard NEMA 5-20 (20A 125V duplex outlets). Each will have an FLA of 10A and will be wired with #12 CU stranded wire. There are also: (5) 125A 480V equipment feeds with a safety disconnect and #1 CU wire (3) 70A 480V equipment feeds with a safety disconnect and #4 CU wire (3) 30A 208V equipment feeds with a safety disconnect and #10 CU wire

ActiveElectrical PermitUpgradeApr 2026
View Details
2026-028413 EP
๐Ÿ”งC & S Enterprises
305 E 3RD ST

Replacement of mini-split system

ActiveMechanical PermitChange OutMar 2026
View Details
2023-130814 MP
๐Ÿ”ง5F Mechanical Co.
305 S CONGRESS AVE

Install new transformer and 400A sub panel Ok Per Steve Leitch. Reference 2025 146628 DA (Wiring to storage and employee restroom receptacles for cameras all on site plan. guard shack?)

ActiveElectrical PermitUpgradeFeb 2026
View Details
2025-138164 EP
๐Ÿ”งRCR Telecon
305 ROWLAND DR

interior remodel - see attached document

FinalMechanical PermitAddition and RemodelJan 2026
View Details
2025-074734 MP
๐Ÿ”งELO Air Conditioning and Heating

Quick Actions

View on TDLR
TDLR ID: TABS2026007608

Property Owner

๐Ÿ‘ค
University of Texas System and Affiliates (Austin Focus)
Contact: Scott Rouse
1055 projects ยท $5.04B
View company profile
601 Colorado St, Austin, Texas 78701
(512) 245-1890
www.austin.utexas.edu

Design Firm

๐Ÿ›๏ธ
Kirksey Architecture
4 projects ยท $14.4M
View all projects
6909 Portwest Dr, Houston, Texas 77024
(713) 426-7488

Registered Accessibility Specialist

๐Ÿ“‹
MARK S,ROBINSON
RAS #1561
8213A SHOAL CREEK BLVD SUITE 102, AUSTIN, TX 78757
(512) 459-2121

Explore Area

๐Ÿ™๏ธ
San Marcos
View city projects
๐Ÿ—บ๏ธ
Hays County
View county projects
๐Ÿ“ฎ
ZIP 78666
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in San Marcos
Licensed contractors directory
๐Ÿ—๏ธ
Builders in San Marcos
Home & commercial builders
๐Ÿ“
Architects in San Marcos
Architecture & design firms

Need a contractor for this project?

Browse verified general contractors active in Hays County

Find General Contractors in Hays

Get alerts for Hays

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects