Starbucks
Starbucks is a renovation/alteration project at 501 W SH 71 Suite B 1020 E SH 71, Bastrop, in Fayette County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $97K across about 3,785 sq ft.
๐Project Metrics
TDLR #TABS2026007659Review Complete
Design review complete, construction may proceed
Starbucks is a Renovation/Alteration project located at 501 W SH 71 Suite B 1020 E SH 71, Bastrop, TX 78963 in Bastrop, Texas. The project has an estimated value of $97K covering 3,785 sq ft. The First National Bank of Bastrop is the property owner. The project was registered with TDLR on December 10, 2025.
โFrequently Asked Questions
What is Starbucks?
Starbucks is a renovation/alteration project at 501 W SH 71 Suite B 1020 E SH 71 in Bastrop, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove & replace ceiling tiles, drywall, insulation. Painting. Disconnect & reconnect HVAC & electrical while work is being performed
Is Starbucks open in Bastrop?
Starbucks is currently under construction in Bastrop, TX. Its current TDLR status is "Review Complete".
Where is Starbucks located?
Starbucks is located at 501 W SH 71 Suite B 1020 E SH 71, Bastrop, TX, 78963, in Fayette County.
Who is the owner or developer of Starbucks?
The First National Bank of Bastrop is the property owner/developer of record for Starbucks, per its TDLR project registration.
How much does Starbucks cost and how big is it?
Starbucks has an estimated construction value of $97K and approximately 3,785 square feet (about $26/sqft), based on its TDLR filing.
๐Scope of Work
Remove & replace ceiling tiles, drywall, insulation. Painting. Disconnect & reconnect HVAC & electrical while work is being performed
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 10, 2025
Review Complete
Jan 4, 2026
Inspection Complete
Closed
25d
Review duration