James Avery Craftsman, Inc. #Q06 is a renovation/alteration project at 1406 Texas Avenue South, College Station, TX 77840, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $290K across about 1,532 sq ft.
Final inspection completed, awaiting project closure
James Avery Craftsman, Inc. #Q06 is a Renovation/Alteration project located at 1406 Texas Avenue South, College Station, TX 77840 in College Station, Texas. The project has an estimated value of $290K covering 1,532 sq ft. HCL Texas Avenue, LLC is the property owner and Simply-Architecture, LLC is the design firm of record. The project was registered with TDLR on December 12, 2025.
James Avery Craftsman, Inc. #Q06 is a renovation/alteration project at 1406 Texas Avenue South, College Station, TX 77840 in College Station, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: remodel 1532 sf of 2293 sf existing jewelry store tenant space
Construction on James Avery Craftsman, Inc. #Q06 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
James Avery Craftsman, Inc. #Q06 is located at 1406 Texas Avenue South, College Station, TX 77840, College Station, TX, 77840, in Brazos County.
HCL Texas Avenue, LLC is the property owner/developer of record for James Avery Craftsman, Inc. #Q06, per its TDLR project registration.
Simply-Architecture, LLC is the design firm of record for James Avery Craftsman, Inc. #Q06, according to its TDLR filing.
James Avery Craftsman, Inc. #Q06 has an estimated construction value of $290K and approximately 1,532 square feet (about $189/sqft), based on its TDLR filing.
remodel 1532 sf of 2293 sf existing jewelry store tenant space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 12, 2025
Review Complete
Dec 22, 2025
Inspection Complete
Jun 20, 2026
Closed
10d
Review duration
180d
Construction phase