Terminal D SSCP/ Arrival Enhancements
Terminal D SSCP/ Arrival Enhancements is a renovation/alteration project at 2400 Aviation Dr., Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $300K across about 450 sq ft.
๐Project Metrics
TDLR #TABS2026008011Project Registered
Project has been registered with TDLR and is in pre-construction phase
Terminal D SSCP/ Arrival Enhancements is a Renovation/Alteration project located at 2400 Aviation Dr., Dfw Airport, TX 76051 in Dfw Airport, Texas. The project has an estimated value of $300K covering 450 sq ft. DFW Airport is the property owner and Corgan Associates is the design firm of record. The project was registered with TDLR on December 15, 2025.
โFrequently Asked Questions
What is Terminal D SSCP/ Arrival Enhancements?
Terminal D SSCP/ Arrival Enhancements is a renovation/alteration project at 2400 Aviation Dr. in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Build concession spaces for Currency Exchange and Cowboys apparel. Finishes to be added on a following contract. Approximately 450 sf.
Is Terminal D SSCP/ Arrival Enhancements open in Dfw Airport?
Terminal D SSCP/ Arrival Enhancements is still under construction in Dfw Airport, TX, with an estimated completion of Apr 2027 according to its TDLR registration.
Where is Terminal D SSCP/ Arrival Enhancements located?
Terminal D SSCP/ Arrival Enhancements is located at 2400 Aviation Dr., Dfw Airport, TX, 76051, in Tarrant County.
Who is the owner or developer of Terminal D SSCP/ Arrival Enhancements?
DFW Airport is the property owner/developer of record for Terminal D SSCP/ Arrival Enhancements, per its TDLR project registration.
Who is the architect or design firm for Terminal D SSCP/ Arrival Enhancements?
Corgan Associates is the design firm of record for Terminal D SSCP/ Arrival Enhancements, according to its TDLR filing.
How much does Terminal D SSCP/ Arrival Enhancements cost and how big is it?
Terminal D SSCP/ Arrival Enhancements has an estimated construction value of $300K and approximately 450 square feet (about $667/sqft), based on its TDLR filing.
๐Scope of Work
Build concession spaces for Currency Exchange and Cowboys apparel. Finishes to be added on a following contract. Approximately 450 sf.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 15, 2025
Review Complete
Inspection Complete
Closed