RRISD Westwood HS - Athletics Improvements
๐Project Metrics
TDLR #TABS2026008209Project Registered
Project has been registered with TDLR and is in pre-construction phase
๐Scope of Work
Running track rebuild, tennis court resurfacing, softball/baseball field grass conversion to turf with netting & fencing upgrades, adding covered batting cages, adding modular locker rooms, and renovations to existing building girl's locker room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Gym remodel: Remove 2 existing roof rafters and 1 existing bean install 2 posts each side of the wall install new beam across the total length of the room as per engineers design. Open roughly framing and install new window approximately 2x3. Run new AC ducts from the closet outlet and install new grills. Run wires and add 1 new outlet
Gym remodel: Remove 2 existing roof rafters and 1 existing bean install 2 posts each side of the wall install new beam across the total length of the room as per engineers design. Open roughly framing and install new window approximately 2x3. Run new AC ducts from the closet outlet and install new grills. Run wires and add 1 new outlet
Tower scope 1 Install new mount modification per plans 6 Cellmax antennas 3 Ericsson air antennas 3 Ericsson radios.
Interior fit-out of existing shell space for new MRI and Neurology Suite.
Interior fit-out of existing shell space for new MRI and Neurology Suite.