Triad Park
Triad Park is a new construction project at 11740 N US Hwy 183, Florence, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $800K across about 14,400 sq ft.
๐Project Metrics
TDLR #TABS2026008337Review Complete
Design review complete, construction may proceed
Triad Park is a New Construction project located at 11740 N US Hwy 183, Florence, TX 76527 in Florence, Texas. The project has an estimated value of $800K covering 14,400 sq ft. Triad Park is the property owner. The project was registered with TDLR on December 17, 2025.
โFrequently Asked Questions
What is Triad Park?
Triad Park is a new construction project at 11740 N US Hwy 183 in Florence, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Two 7200sf metal, single-story shell buildings
Is Triad Park open in Florence?
Triad Park is still under construction in Florence, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is Triad Park located?
Triad Park is located at 11740 N US Hwy 183, Florence, TX, 76527, in Williamson County.
Who is the owner or developer of Triad Park?
Triad Park is the property owner/developer of record for Triad Park, per its TDLR project registration.
How much does Triad Park cost and how big is it?
Triad Park has an estimated construction value of $800K and approximately 14,400 square feet (about $56/sqft), based on its TDLR filing.
๐Scope of Work
Two 7200sf metal, single-story shell buildings
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 17, 2025
Review Complete
Jan 10, 2026
Inspection Complete
Closed
๐Related City Permits
Building permits found at or near this location
16ft tunnel to repair broken drain under foundation.
Replacement of complete existing central heat and air system with or without duct work Single stage 4 ton gas
Replacement of an existing water heater replacing the water heater with a tankless water heater
Transitioning from LP gas to natural gas in both buildings (Building 1 and Building 2)
Palomino - Install new 6.57kW rooftop solar system to existing residential only using backfed breaker. Upgrading MSP to 200amp Utility company - PEC
Property Owner
Registered Accessibility Specialist
Williamson County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Williamson County
Find General Contractors in Williamson