MCCLAIN’S RV PARK
📊Project Metrics
TDLR #TABS2026008480Project Registered
Project has been registered with TDLR and is in pre-construction phase
📋Scope of Work
New PEMB Shop and Office
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
🔗Related Projects
📄Related City Permits
Building permits found at or near this location
UTILITY CONTROLLED OUTAGE REQUIRED FOR PHASE 2 ADDITION OF TEG-2 & (2) POWERWALLS -AUSTIN ENERGY REQUIRES (2) ADDITIONAL DISCONNECTS; (1) WITHIN 5 OF THE POWERWALLS & (1) WITHIN 5 OF SERVICE
(4) NEW TESLA POWER WALL 2.0 BATTERY NEW POWERWALL COMBINER PANEL NEW POWERWALL DISCONNECT
Upgrading the internal wiring of the PV meter will be up-sizing conductors from #8 to #6 and Austin Energy is replacing an outdated PV meter.
upgrading the internal wiring of the PV meter will be up-sizing conductors from #8 to #6 and Austin Energy is replacing an outdated PV meter.
Install addition of 2.38 kW to existing roof mounted solar to PV system.