QuikTrip # 4157 Fryer Project is a renovation/alteration project at 1307 N FM 620 Rd., Lakeway, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $125K across about 300 sq ft.
Design review complete, construction may proceed
QuikTrip # 4157 Fryer Project is a Renovation/Alteration project located at 1307 N FM 620 Rd., Lakeway, TX 78734 in Lakeway, Texas. The project has an estimated value of $125K covering 300 sq ft. QT South , LLC is the property owner and Daniel D. Filuk, Architect is the design firm of record. The project was registered with TDLR on December 19, 2025.
QuikTrip # 4157 Fryer Project is a renovation/alteration project at 1307 N FM 620 Rd. in Lakeway, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Includes re-organization of existing kitchen equipment and addition of new fryer units. Project 300 sf.
QuikTrip # 4157 Fryer Project is currently under construction in Lakeway, TX. Its current TDLR status is "Review Complete".
QuikTrip # 4157 Fryer Project is located at 1307 N FM 620 Rd., Lakeway, TX, 78734, in Travis County.
QT South , LLC is the property owner/developer of record for QuikTrip # 4157 Fryer Project, per its TDLR project registration.
Daniel D. Filuk, Architect is the design firm of record for QuikTrip # 4157 Fryer Project, according to its TDLR filing.
QuikTrip # 4157 Fryer Project has an estimated construction value of $125K and approximately 300 square feet (about $417/sqft), based on its TDLR filing.
Includes re-organization of existing kitchen equipment and addition of new fryer units. Project 300 sf.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 19, 2025
Review Complete
Jan 29, 2026
Inspection Complete
Closed
41d
Review duration
Building permits found at or near this location
ePlan: Residential Expedited Review - New Construction of 2-Story SF Res [5bed 4bath] with habitable attic and attached garage
New pool and spa
ePlan: Commercial Expedited Review - [APPROVED] New Construction of 3-Story Worship Learning Center to Include Outdoor Playground [ 10472 SF] **Landscape Inspection required**
Convert a portion of the existing screened porch into a new primary bathroom. The existing angled wall at the screened porch will be reconfigured to a 90-degree wall. The existing primary bathroom will be converted into closet space. Additionally the existing guest bathroom will be remodeled.
Total demo of sfr 900 sqft circa 1952