Roche Analyzer Installation
Roche Analyzer Installation is a renovation/alteration project at 305 Mallard Lane Suite 1800, Taylor, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2026. The project has an estimated value of $600K across about 1,307 sq ft.
๐Project Metrics
TDLR #TABS2026008677Review Complete
Design review complete, construction may proceed
Roche Analyzer Installation is a Renovation/Alteration project located at 305 Mallard Lane Suite 1800, Taylor, TX 76574 in Taylor, Texas. The project has an estimated value of $600K covering 1,307 sq ft. Scott & White Hospital - Taylor is the property owner. The project was registered with TDLR on December 19, 2025.
โFrequently Asked Questions
What is Roche Analyzer Installation?
Roche Analyzer Installation is a renovation/alteration project at 305 Mallard Lane Suite 1800 in Taylor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement of a large scale analyzer
Is Roche Analyzer Installation open in Taylor?
Roche Analyzer Installation is still under construction in Taylor, TX, with an estimated completion of Oct 2026 according to its TDLR registration.
Where is Roche Analyzer Installation located?
Roche Analyzer Installation is located at 305 Mallard Lane Suite 1800, Taylor, TX, 76574, in Williamson County.
Who is the owner or developer of Roche Analyzer Installation?
Scott & White Hospital - Taylor is the property owner/developer of record for Roche Analyzer Installation, per its TDLR project registration.
How much does Roche Analyzer Installation cost and how big is it?
Roche Analyzer Installation has an estimated construction value of $600K and approximately 1,307 square feet (about $459/sqft), based on its TDLR filing.
๐Scope of Work
Replacement of a large scale analyzer
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 19, 2025
Review Complete
Mar 7, 2026
Inspection Complete
Closed
78d
Review duration
๐Related City Permits
Building permits found at or near this location
Construct new driveway approach of 28 FT and sidewalk of 11FT 6IN with curb/gutter of 91.2ft
We will be adding mulitple panels and receptacles for tenant to put in equipment and office area. There will be no additional meter needed. 40 20A 120V. DUPLEX RECEPTACLE 7 - 20A 120V. QUADRAPLEX RECEPTACLE These 120V outlets being installed are standard NEMA 5-20 (20A 125V duplex outlets). Each will have an FLA of 10A and will be wired with #12 CU stranded wire. There are also: (5) 125A 480V equipment feeds with a safety disconnect and #1 CU wire (3) 70A 480V equipment feeds with a safety disconnect and #4 CU wire (3) 30A 208V equipment feeds with a safety disconnect and #10 CU wire
Replacement of mini-split system
Install new transformer and 400A sub panel Ok Per Steve Leitch. Reference 2025 146628 DA (Wiring to storage and employee restroom receptacles for cameras all on site plan. guard shack?)
interior remodel - see attached document