Greysteel
Greysteel is a renovation/alteration project at 2626 Howell Street Suite 965, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $170K across about 4,244 sq ft.
๐Project Metrics
TDLR #TABS2026008689Inspection Complete
Final inspection completed, awaiting project closure
Greysteel is a Renovation/Alteration project located at 2626 Howell Street Suite 965, Dallas, TX 75204 in Dallas, Texas. The project has an estimated value of $170K covering 4,244 sq ft. Uptown Center JV, LP is the property owner and Go Studio is the design firm of record. The project was registered with TDLR on December 21, 2025.
โFrequently Asked Questions
What is Greysteel?
Greysteel is a renovation/alteration project at 2626 Howell Street Suite 965 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing office space in a high rise building.
Is Greysteel open in Dallas?
Construction on Greysteel is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Where is Greysteel located?
Greysteel is located at 2626 Howell Street Suite 965, Dallas, TX, 75204, in Dallas County.
Who is the owner or developer of Greysteel?
Uptown Center JV, LP is the property owner/developer of record for Greysteel, per its TDLR project registration.
Who is the architect or design firm for Greysteel?
Go Studio is the design firm of record for Greysteel, according to its TDLR filing.
How much does Greysteel cost and how big is it?
Greysteel has an estimated construction value of $170K and approximately 4,244 square feet (about $40/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation of existing office space in a high rise building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 21, 2025
Review Complete
Jan 1, 2026
Inspection Complete
Apr 1, 2026
Closed
11d
Review duration
90d
Construction phase