17 LCRR is a renovation/alteration project at 777 MAIN STREET, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $400K across about 1,874 sq ft.
๐Project Metrics
TDLR #TABS2026009433Review Complete
Design review complete, construction may proceed
17 LCRR is a Renovation/Alteration project located at 777 MAIN STREET, Fort Worth, TX 76102 in Fort Worth, Texas. The project has an estimated value of $400K covering 1,874 sq ft. F7 SSSM, LLC is the property owner and JACOBS ENGINEERING is the design firm of record. The project was registered with TDLR on January 7, 2026.
โFrequently Asked Questions
What is 17 LCRR?
17 LCRR is a renovation/alteration project at 777 MAIN STREET in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: RENOVATION OF THE COMMON CORRIDORS, ELEVATOR LOBBY, AND RESTROOMS TO INCORPORATE BUILDING STANDARD FIXTURES AND FINISHES.
Is 17 LCRR open in Fort Worth?
17 LCRR is currently under construction in Fort Worth, TX. Its current TDLR status is "Review Complete".
Where is 17 LCRR located?
17 LCRR is located at 777 MAIN STREET, Fort Worth, TX, 76102, in Tarrant County.
Who is the owner or developer of 17 LCRR?
F7 SSSM, LLC is the property owner/developer of record for 17 LCRR, per its TDLR project registration.
Who is the architect or design firm for 17 LCRR?
JACOBS ENGINEERING is the design firm of record for 17 LCRR, according to its TDLR filing.
How much does 17 LCRR cost and how big is it?
17 LCRR has an estimated construction value of $400K and approximately 1,874 square feet (about $213/sqft), based on its TDLR filing.
๐Scope of Work
RENOVATION OF THE COMMON CORRIDORS, ELEVATOR LOBBY, AND RESTROOMS TO INCORPORATE BUILDING STANDARD FIXTURES AND FINISHES.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 7, 2026
Review Complete
May 23, 2026
Inspection Complete
Closed
136d
Review duration