X-Ray Room 3
X-Ray Room 3 is a renovation/alteration project at 1301 Wonder World, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2026. The project has an estimated value of $300K across about 309 sq ft.
๐Project Metrics
TDLR #TABS2026010569Review Complete
Design review complete, construction may proceed
X-Ray Room 3 is a Renovation/Alteration project located at 1301 Wonder World, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $300K covering 309 sq ft. CHRISTUS SANTA ROSA HEALTH CARE CORPORATION is the property owner and LK Design Group Inc. is the design firm of record. The project was registered with TDLR on January 21, 2026.
โFrequently Asked Questions
What is X-Ray Room 3?
X-Ray Room 3 is a renovation/alteration project at 1301 Wonder World in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation for equipment replacement
Is X-Ray Room 3 open in San Marcos?
X-Ray Room 3 is still under construction in San Marcos, TX, with an estimated completion of Aug 2026 according to its TDLR registration.
Where is X-Ray Room 3 located?
X-Ray Room 3 is located at 1301 Wonder World, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of X-Ray Room 3?
CHRISTUS SANTA ROSA HEALTH CARE CORPORATION is the property owner/developer of record for X-Ray Room 3, per its TDLR project registration.
Who is the architect or design firm for X-Ray Room 3?
LK Design Group Inc. is the design firm of record for X-Ray Room 3, according to its TDLR filing.
How much does X-Ray Room 3 cost and how big is it?
X-Ray Room 3 has an estimated construction value of $300K and approximately 309 square feet (about $971/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation for equipment replacement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 21, 2026
Review Complete
Jan 29, 2026
Inspection Complete
Closed
8d
Review duration
๐Related Projects
๐คSame Owner
$4.3M total๐Related City Permits
Building permits found at or near this location
Express- 16 concrete piers and 42 ft. of tunneling
ePlan: Commercial Expedited Review - Interior Remodel to Existing Light Manufacturing Areas (128726 SF)
Replacement of an existing water heater swapping gas tank water heater for a similar model.
New pool with required enclosure and concrete deck (heater or autofill)
New pool with required enclosure and concrete deck (heater or autofill)