Siemens
Siemens is a renovation/alteration project at 4830 N Loop 1604 W., San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.2M across about 7,440 sq ft.
๐Project Metrics
TDLR #TABS2026010881Review Complete
Design review complete, construction may proceed
Siemens is a Renovation/Alteration project located at 4830 N Loop 1604 W., San Antonio, TX 78249 in San Antonio, Texas. The project has an estimated value of $1.2M covering 7,440 sq ft. ICP FULLER PINNACLE OAKS LLC is the property owner and METHOD ARCHITECTURE is the design firm of record. The project was registered with TDLR on January 26, 2026.
โFrequently Asked Questions
What is Siemens?
Siemens is a renovation/alteration project at 4830 N Loop 1604 W. in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR OFFICE REMODEL (7,440 SF) IN AN EXISTING BUILDING WITH NEW DEMISING WALLS AND A NEW DOCK DOOR.
Is Siemens open in San Antonio?
Siemens is currently under construction in San Antonio, TX. Its current TDLR status is "Review Complete".
Where is Siemens located?
Siemens is located at 4830 N Loop 1604 W., San Antonio, TX, 78249, in Bexar County.
Who is the owner or developer of Siemens?
ICP FULLER PINNACLE OAKS LLC is the property owner/developer of record for Siemens, per its TDLR project registration.
Who is the architect or design firm for Siemens?
METHOD ARCHITECTURE is the design firm of record for Siemens, according to its TDLR filing.
How much does Siemens cost and how big is it?
Siemens has an estimated construction value of $1.2M and approximately 7,440 square feet (about $164/sqft), based on its TDLR filing.
๐Scope of Work
INTERIOR OFFICE REMODEL (7,440 SF) IN AN EXISTING BUILDING WITH NEW DEMISING WALLS AND A NEW DOCK DOOR.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 26, 2026
Review Complete
May 3, 2026
Inspection Complete
Closed
97d
Review duration