Watchfire
Watchfire is a renovation/alteration project at 9201 Winkler Dr, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $96K across about 38,600 sq ft.
๐Project Metrics
TDLR #TABS2026012717Review Complete
Design review complete, construction may proceed
Watchfire is a Renovation/Alteration project located at 9201 Winkler Dr, Houston, TX 77017 in Houston, Texas. The project has an estimated value of $96K covering 38,600 sq ft. MZ 9201 Winkler LLC is the property owner and Method Architecture is the design firm of record. The project was registered with TDLR on February 16, 2026.
โFrequently Asked Questions
What is Watchfire?
Watchfire is a renovation/alteration project at 9201 Winkler Dr in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New equipment in an existing 38,600 sf warehouse
Is Watchfire open in Houston?
Watchfire is currently under construction in Houston, TX. Its current TDLR status is "Review Complete".
Where is Watchfire located?
Watchfire is located at 9201 Winkler Dr, Houston, TX, 77017, in Harris County.
Who is the owner or developer of Watchfire?
MZ 9201 Winkler LLC is the property owner/developer of record for Watchfire, per its TDLR project registration.
Who is the architect or design firm for Watchfire?
Method Architecture is the design firm of record for Watchfire, according to its TDLR filing.
How much does Watchfire cost and how big is it?
Watchfire has an estimated construction value of $96K and approximately 38,600 square feet (about $2/sqft), based on its TDLR filing.
๐Scope of Work
New equipment in an existing 38,600 sf warehouse
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 16, 2026
Review Complete
Mar 8, 2026
Inspection Complete
Closed
20d
Review duration