505 E 50th St
505 E 50th St is a renovation/alteration project at 505 E 50th St, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $1.0M across about 30,607 sq ft.
๐Project Metrics
TDLR #TABS2026013341Review Complete
Design review complete, construction may proceed
505 E 50th St is a Renovation/Alteration project located at 505 E 50th St, Lubbock, TX 79404 in Lubbock, Texas. The project has an estimated value of $1.0M covering 30,607 sq ft. Kevin Mincey is the property owner. The project was registered with TDLR on February 24, 2026.
โFrequently Asked Questions
What is 505 E 50th St?
505 E 50th St is a renovation/alteration project at 505 E 50th St in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This is a remodel of an existing space that is being remodeled to fit the needs of the new owner.
Is 505 E 50th St open in Lubbock?
505 E 50th St is still under construction in Lubbock, TX, with an estimated completion of Feb 2027 according to its TDLR registration.
Where is 505 E 50th St located?
505 E 50th St is located at 505 E 50th St, Lubbock, TX, 79404, in Lubbock County.
Who is the owner or developer of 505 E 50th St?
Kevin Mincey is the property owner/developer of record for 505 E 50th St, per its TDLR project registration.
How much does 505 E 50th St cost and how big is it?
505 E 50th St has an estimated construction value of $1.0M and approximately 30,607 square feet (about $33/sqft), based on its TDLR filing.
๐Scope of Work
This is a remodel of an existing space that is being remodeled to fit the needs of the new owner.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 24, 2026
Review Complete
May 10, 2026
Inspection Complete
Closed
75d
Review duration