UTEP-IDRB - lvl 4 - Phase 2 Lab
UTEP-IDRB - lvl 4 - Phase 2 Lab is a additions to existing building project at 3411-A Sun Bowl Drive, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $5.7M across about 4,000 sq ft.
๐Project Metrics
TDLR #TABS2026013353Review Complete
Design review complete, construction may proceed
UTEP-IDRB - lvl 4 - Phase 2 Lab is a Additions to Existing Building project located at 3411-A Sun Bowl Drive, El Paso, TX 79902 in El Paso, Texas. The project has an estimated value of $5.7M covering 4,000 sq ft. University of Texas El Paso is the property owner. The project was registered with TDLR on February 24, 2026.
โFrequently Asked Questions
What is UTEP-IDRB - lvl 4 - Phase 2 Lab?
UTEP-IDRB - lvl 4 - Phase 2 Lab is a additions to existing building project at 3411-A Sun Bowl Drive in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Build-out of space on 4th floor of existing shell building into lab research space
Is UTEP-IDRB - lvl 4 - Phase 2 Lab open in El Paso?
UTEP-IDRB - lvl 4 - Phase 2 Lab is still under construction in El Paso, TX, with an estimated completion of Apr 2027 according to its TDLR registration.
Where is UTEP-IDRB - lvl 4 - Phase 2 Lab located?
UTEP-IDRB - lvl 4 - Phase 2 Lab is located at 3411-A Sun Bowl Drive, El Paso, TX, 79902, in El Paso County.
Who is the owner or developer of UTEP-IDRB - lvl 4 - Phase 2 Lab?
University of Texas El Paso is the property owner/developer of record for UTEP-IDRB - lvl 4 - Phase 2 Lab, per its TDLR project registration.
How much does UTEP-IDRB - lvl 4 - Phase 2 Lab cost and how big is it?
UTEP-IDRB - lvl 4 - Phase 2 Lab has an estimated construction value of $5.7M and approximately 4,000 square feet (about $1.43K/sqft), based on its TDLR filing.
๐Scope of Work
Build-out of space on 4th floor of existing shell building into lab research space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 24, 2026
Review Complete
Mar 14, 2026
Inspection Complete
Closed
18d
Review duration