Bao Bao
Bao Bao is a renovation/alteration project at 6406 N INTERSTATE HWY 35, SUITE 1250, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2026. The project has an estimated value of $70K across about 1,750 sq ft.
๐Project Metrics
TDLR #TABS2026013451Project Registered
Project has been registered with TDLR and is in pre-construction phase
Bao Bao is a Renovation/Alteration project located at 6406 N INTERSTATE HWY 35, SUITE 1250, Austin, TX 78752 in Austin, Texas. The project has an estimated value of $70K covering 1,750 sq ft. LED-LINC LLC is the property owner and ACC&Design is the design firm of record. The project was registered with TDLR on February 24, 2026.
โFrequently Asked Questions
What is Bao Bao?
Bao Bao is a renovation/alteration project at 6406 N INTERSTATE HWY 35, SUITE 1250 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of lease site, new restaurant
Is Bao Bao open in Austin?
Bao Bao is still under construction in Austin, TX, with an estimated completion of Oct 2026 according to its TDLR registration.
Where is Bao Bao located?
Bao Bao is located at 6406 N INTERSTATE HWY 35, SUITE 1250, Austin, TX, 78752, in Travis County.
Who is the owner or developer of Bao Bao?
LED-LINC LLC is the property owner/developer of record for Bao Bao, per its TDLR project registration.
Who is the architect or design firm for Bao Bao?
ACC&Design is the design firm of record for Bao Bao, according to its TDLR filing.
How much does Bao Bao cost and how big is it?
Bao Bao has an estimated construction value of $70K and approximately 1,750 square feet (about $40/sqft), based on its TDLR filing.
๐Scope of Work
Interior remodel of lease site, new restaurant
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 24, 2026
Review Complete
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$3.4M total๐Related City Permits
Building permits found at or near this location
Express: Remove and replace 16 windows (like for like)
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
REMODEL EXISTING THEATRE SPACE ADD SLOPE FLOOR FOR ELEVATED SEATING AND NEW PARTITION FOR GREEN ROOM.
REMODEL EXISTING THEATRE SPACE ADD SLOPE FLOOR FOR ELEVATED SEATING AND NEW PARTITION FOR GREEN ROOM.
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA