MD7
MD7 is a renovation/alteration project at 950 W. Bethany Drive Suite 600, Allen, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $800K across about 12,832 sq ft.
๐Project Metrics
TDLR #TABS2026013753Review Complete
Design review complete, construction may proceed
MD7 is a Renovation/Alteration project located at 950 W. Bethany Drive Suite 600, Allen, TX 75013 in Allen, Texas. The project has an estimated value of $800K covering 12,832 sq ft. Allen TX Office 2 PREF-HC OBW, LLC is the property owner and Schwabauer Design is the design firm of record. The project was registered with TDLR on February 27, 2026.
โFrequently Asked Questions
What is MD7?
MD7 is a renovation/alteration project at 950 W. Bethany Drive Suite 600 in Allen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior office renovation
Is MD7 open in Allen?
MD7 is currently under construction in Allen, TX. Its current TDLR status is "Review Complete".
Where is MD7 located?
MD7 is located at 950 W. Bethany Drive Suite 600, Allen, TX, 75013, in Collin County.
Who is the owner or developer of MD7?
Allen TX Office 2 PREF-HC OBW, LLC is the property owner/developer of record for MD7, per its TDLR project registration.
Who is the architect or design firm for MD7?
Schwabauer Design is the design firm of record for MD7, according to its TDLR filing.
How much does MD7 cost and how big is it?
MD7 has an estimated construction value of $800K and approximately 12,832 square feet (about $62/sqft), based on its TDLR filing.
๐Scope of Work
Interior office renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 27, 2026
Review Complete
Apr 5, 2026
Inspection Complete
Closed
37d
Review duration