USSI
USSI is a renovation/alteration project at 1401 ENCLAVE PKWY, LEVEL 6, SUITE 675, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $940K across about 11,752 sq ft.
๐Project Metrics
TDLR #TABS2026014174Review Complete
Design review complete, construction may proceed
USSI is a Renovation/Alteration project located at 1401 ENCLAVE PKWY, LEVEL 6, SUITE 675, Houston, TX 77077 in Houston, Texas. The project has an estimated value of $940K covering 11,752 sq ft. FCA FUND HOUSTON I LLC is the property owner and ZIEGLER COOPER ARCHITECTS is the design firm of record. The project was registered with TDLR on March 4, 2026.
โFrequently Asked Questions
What is USSI?
USSI is a renovation/alteration project at 1401 ENCLAVE PKWY, LEVEL 6, SUITE 675 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: RENOVATION TO EXISTING SPACE
Is USSI open in Houston?
USSI is currently under construction in Houston, TX. Its current TDLR status is "Review Complete".
Where is USSI located?
USSI is located at 1401 ENCLAVE PKWY, LEVEL 6, SUITE 675, Houston, TX, 77077, in Harris County.
Who is the owner or developer of USSI?
FCA FUND HOUSTON I LLC is the property owner/developer of record for USSI, per its TDLR project registration.
Who is the architect or design firm for USSI?
ZIEGLER COOPER ARCHITECTS is the design firm of record for USSI, according to its TDLR filing.
How much does USSI cost and how big is it?
USSI has an estimated construction value of $940K and approximately 11,752 square feet (about $80/sqft), based on its TDLR filing.
๐Scope of Work
RENOVATION TO EXISTING SPACE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 4, 2026
Review Complete
Apr 8, 2026
Inspection Complete
Closed
35d
Review duration