BasePoint - Breakthrough
BasePoint - Breakthrough is a renovation/alteration project at 4601 Medical Center Drive, Suite A, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $650K across about 3,127 sq ft.
๐Project Metrics
TDLR #TABS2026014286Review Complete
Design review complete, construction may proceed
BasePoint - Breakthrough is a Renovation/Alteration project located at 4601 Medical Center Drive, Suite A, Mckinney, TX 75069 in Mckinney, Texas. The project has an estimated value of $650K covering 3,127 sq ft. Ridgeline McKinney MOB SPE LLC is the property owner and Schwabauer Design is the design firm of record. The project was registered with TDLR on March 5, 2026.
โFrequently Asked Questions
What is BasePoint - Breakthrough?
BasePoint - Breakthrough is a renovation/alteration project at 4601 Medical Center Drive, Suite A in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Improvement
Is BasePoint - Breakthrough open in Mckinney?
BasePoint - Breakthrough is currently under construction in Mckinney, TX. Its current TDLR status is "Review Complete".
Where is BasePoint - Breakthrough located?
BasePoint - Breakthrough is located at 4601 Medical Center Drive, Suite A, Mckinney, TX, 75069, in Collin County.
Who is the owner or developer of BasePoint - Breakthrough?
Ridgeline McKinney MOB SPE LLC is the property owner/developer of record for BasePoint - Breakthrough, per its TDLR project registration.
Who is the architect or design firm for BasePoint - Breakthrough?
Schwabauer Design is the design firm of record for BasePoint - Breakthrough, according to its TDLR filing.
How much does BasePoint - Breakthrough cost and how big is it?
BasePoint - Breakthrough has an estimated construction value of $650K and approximately 3,127 square feet (about $208/sqft), based on its TDLR filing.
๐Scope of Work
Tenant Improvement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 5, 2026
Review Complete
Apr 7, 2026
Inspection Complete
Closed
33d
Review duration