Pilates Addiction
๐Project Metrics
TDLR #TABS2026014309Project Registered
Project has been registered with TDLR and is in pre-construction phase
๐Scope of Work
Commercial Tenant finish (TI) buildout to include new walls, demolition, ductwork, building, electrical, mechanical, and plumbing.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$2.7M total๐๏ธSame Design Firm
$918K total๐Related City Permits
Building permits found at or near this location
New digital meter was not reading Austin energy sent a tech out to investigate AE tech found that the stinger wire was not terminated inside the meter can which was not required for old analog meters. AE gave client 72 hours shut down notice if repairs were not made client called us to make repairs. Repairs have been completed already. Repairs landing stinger wire to neutral lug inside meter can.
Installing 277/480 v 800 Amp for New Car Wash in the ETJ SP-2022-0121D
Install illuminated channel letters on raceway reading PREMIER MARTIAL ARTS facing South
temp power for 5145 1/2 - ETJ
Replacement of an existing water heater