Round Rock ISD McNeil HS Phase 3 is a renovation/alteration project at 5720 McNeil Dr, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2028. The project has an estimated value of $52.0M across about 14,500 sq ft.
Design review complete, construction may proceed
Round Rock ISD McNeil HS Phase 3 is a Renovation/Alteration project located at 5720 McNeil Dr, Austin, TX 78729 in Austin, Texas. The project has an estimated value of $52.0M covering 14,500 sq ft. Round Rock Independent School District is the property owner and Perkins & Will is the design firm of record. The project was registered with TDLR on March 6, 2026.
Round Rock ISD McNeil HS Phase 3 is a renovation/alteration project at 5720 McNeil Dr in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Major Renovation of portions of existing high school buildings.
Round Rock ISD McNeil HS Phase 3 is still under construction in Austin, TX, with an estimated completion of Sep 2028 according to its TDLR registration.
Round Rock ISD McNeil HS Phase 3 is located at 5720 McNeil Dr, Austin, TX, 78729, in Travis County.
Round Rock Independent School District is the property owner/developer of record for Round Rock ISD McNeil HS Phase 3, per its TDLR project registration.
Perkins & Will is the design firm of record for Round Rock ISD McNeil HS Phase 3, according to its TDLR filing.
Round Rock ISD McNeil HS Phase 3 has an estimated construction value of $52.0M and approximately 14,500 square feet (about $3.59K/sqft), based on its TDLR filing.
Major Renovation of portions of existing high school buildings.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 6, 2026
Review Complete
Mar 10, 2026
Inspection Complete
Closed
4d
Review duration
Building permits found at or near this location
We will be installing a Manual Transfer Switch which would allow the customer to connect a TEMPORARY towable generator when needed. The transfer switch is to be installed after the EXISTING Main Service disconnect which is to remain an interlock mechanism prevents the MTS from backfeeding to utility.
Replacement of complete existing central heat and air system with or without duct work
Express: Foundation repair
Replacement of complete existing central heat and air system with or without duct work
Express - Foundation Repair