Rudoph Foods Phase 1-3
Rudoph Foods Phase 1-3 is a renovation/alteration project at 3660 Pipestone, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $4.0M across about 48,479 sq ft.
๐Project Metrics
TDLR #TABS2026015133Review Complete
Design review complete, construction may proceed
Rudoph Foods Phase 1-3 is a Renovation/Alteration project located at 3660 Pipestone, Dallas, TX 75212 in Dallas, Texas. The project has an estimated value of $4.0M covering 48,479 sq ft. St. Germain Holdings LTD is the property owner. The project was registered with TDLR on March 17, 2026.
โFrequently Asked Questions
What is Rudoph Foods Phase 1-3?
Rudoph Foods Phase 1-3 is a renovation/alteration project at 3660 Pipestone in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior insulated metal panel walls, replace (3) high speed doors, insulated metal panel ceiling, metal panel wall skins,
Is Rudoph Foods Phase 1-3 open in Dallas?
Rudoph Foods Phase 1-3 is currently under construction in Dallas, TX. Its current TDLR status is "Review Complete".
Where is Rudoph Foods Phase 1-3 located?
Rudoph Foods Phase 1-3 is located at 3660 Pipestone, Dallas, TX, 75212, in Dallas County.
Who is the owner or developer of Rudoph Foods Phase 1-3?
St. Germain Holdings LTD is the property owner/developer of record for Rudoph Foods Phase 1-3, per its TDLR project registration.
How much does Rudoph Foods Phase 1-3 cost and how big is it?
Rudoph Foods Phase 1-3 has an estimated construction value of $4.0M and approximately 48,479 square feet (about $83/sqft), based on its TDLR filing.
๐Scope of Work
Interior insulated metal panel walls, replace (3) high speed doors, insulated metal panel ceiling, metal panel wall skins,
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 17, 2026
Review Complete
Apr 6, 2026
Inspection Complete
Closed
20d
Review duration