PCS TI
PCS TI is a renovation/alteration project at 4601 Dr. MLK Jr. Drive, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $315K across about 160,231 sq ft.
๐Project Metrics
TDLR #TABS2026016085Review Complete
Design review complete, construction may proceed
PCS TI is a Renovation/Alteration project located at 4601 Dr. MLK Jr. Drive, Arlington, TX 76018 in Arlington, Texas. The project has an estimated value of $315K covering 160,231 sq ft. PI DFW Bardin LP is the property owner and LGE DesignBuild is the design firm of record. The project was registered with TDLR on March 27, 2026.
โFrequently Asked Questions
What is PCS TI?
PCS TI is a renovation/alteration project at 4601 Dr. MLK Jr. Drive in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Alteration to an existing Spec Suite office. Addition of (2) large bathrooms, (4) offices, IT room, and Conference room.
Is PCS TI open in Arlington?
PCS TI is currently under construction in Arlington, TX. Its current TDLR status is "Review Complete".
Where is PCS TI located?
PCS TI is located at 4601 Dr. MLK Jr. Drive, Arlington, TX, 76018, in Tarrant County.
Who is the owner or developer of PCS TI?
PI DFW Bardin LP is the property owner/developer of record for PCS TI, per its TDLR project registration.
Who is the architect or design firm for PCS TI?
LGE DesignBuild is the design firm of record for PCS TI, according to its TDLR filing.
How much does PCS TI cost and how big is it?
PCS TI has an estimated construction value of $315K and approximately 160,231 square feet (about $2/sqft), based on its TDLR filing.
๐Scope of Work
Alteration to an existing Spec Suite office. Addition of (2) large bathrooms, (4) offices, IT room, and Conference room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 27, 2026
Review Complete
Jun 20, 2026
Inspection Complete
Closed
85d
Review duration