Southern Steer Butcher
Southern Steer Butcher is a renovation/alteration project at 4701 183A TOLL WAY BLDG A Ste 100, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2026. The project has an estimated value of $250K across about 1,827 sq ft.
๐Project Metrics
TDLR #TABS2026016638Review Complete
Design review complete, construction may proceed
Southern Steer Butcher is a Renovation/Alteration project located at 4701 183A TOLL WAY BLDG A Ste 100, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $250K covering 1,827 sq ft. KRG Cedar Park Town Center, LLC is the property owner and The Brown Group is the design firm of record. The project was registered with TDLR on April 2, 2026.
โFrequently Asked Questions
What is Southern Steer Butcher?
Southern Steer Butcher is a renovation/alteration project at 4701 183A TOLL WAY BLDG A Ste 100 in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior remodel in an existing lease space. change of use from retail to mercantile. existing toilet to remain
Is Southern Steer Butcher open in Cedar Park?
Southern Steer Butcher is still under construction in Cedar Park, TX, with an estimated completion of Oct 2026 according to its TDLR registration.
Where is Southern Steer Butcher located?
Southern Steer Butcher is located at 4701 183A TOLL WAY BLDG A Ste 100, Cedar Park, TX, 78613, in Williamson County.
Who is the owner or developer of Southern Steer Butcher?
KRG Cedar Park Town Center, LLC is the property owner/developer of record for Southern Steer Butcher, per its TDLR project registration.
Who is the architect or design firm for Southern Steer Butcher?
The Brown Group is the design firm of record for Southern Steer Butcher, according to its TDLR filing.
How much does Southern Steer Butcher cost and how big is it?
Southern Steer Butcher has an estimated construction value of $250K and approximately 1,827 square feet (about $137/sqft), based on its TDLR filing.
๐Scope of Work
interior remodel in an existing lease space. change of use from retail to mercantile. existing toilet to remain
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 2, 2026
Review Complete
Apr 10, 2026
Inspection Complete
Closed
8d
Review duration
๐Related Projects
๐๏ธSame Design Firm
$3.0M total๐Related City Permits
Building permits found at or near this location
Tunnel approx 30ft under home to re-route kitchen sink drain line to front of house and connect.
Verizon to bring in new fiber to an existing cell site.
Replacement of complete existing central heat and air system with or without duct work like for like replacement on complete system
Tunnel under foundation to replace cast iron drain for 2 full bathrooms kitchen and washer. 2 access holes one in the front right corner and the second in the back of the home. Sewer line will be replaced from the home to the city tap connection total length 40 feet.
ePlan: Residential Expedited Review - New Autofill/Heated Pool. 4701 Bolm Rd.