Opening ~Mar 2027๐Ÿ“Review Complete๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

BP 037-Sitework Package 2

6200 Homeward Way, Sugar Land, TX 77479, Sugar Land, TX, 77479

BP 037-Sitework Package 2 is a renovation/alteration project at 6200 Homeward Way, Sugar Land, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $417K across about 1 sq ft.

Construction50%

๐Ÿ“ŠProject Metrics

TDLR #TABS2026016757
$417K
Project Value
1
Square Feet
$416.96K/sqft
Cost/SqFt
9 months
Duration
Registered:Apr 2, 2026
Start:Jun 15, 2026
Target:Mar 6, 2027
Remaining:239 days
๐Ÿ“

Review Complete

Design review complete, construction may proceed

BP 037-Sitework Package 2 is a Renovation/Alteration project located at 6200 Homeward Way, Sugar Land, TX 77479 in Sugar Land, Texas. The project has an estimated value of $417K covering 1 sq ft. Fort Bend ISD is the property owner and cre8 Architects is the design firm of record. The project was registered with TDLR on April 2, 2026.

โ“Frequently Asked Questions

What is BP 037-Sitework Package 2?

BP 037-Sitework Package 2 is a renovation/alteration project at 6200 Homeward Way in Sugar Land, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Extending the drive to increase stacking space at student drop-off, regrading front planting bed to drain, regrading around play fields, replace accessible ramp at south ramp at south side of building

Is BP 037-Sitework Package 2 open in Sugar Land?

BP 037-Sitework Package 2 is still under construction in Sugar Land, TX, with an estimated completion of Mar 2027 according to its TDLR registration.

Where is BP 037-Sitework Package 2 located?

BP 037-Sitework Package 2 is located at 6200 Homeward Way, Sugar Land, TX, 77479, in Fort Bend County.

Who is the owner or developer of BP 037-Sitework Package 2?

Fort Bend ISD is the property owner/developer of record for BP 037-Sitework Package 2, per its TDLR project registration.

Who is the architect or design firm for BP 037-Sitework Package 2?

cre8 Architects is the design firm of record for BP 037-Sitework Package 2, according to its TDLR filing.

How much does BP 037-Sitework Package 2 cost and how big is it?

BP 037-Sitework Package 2 has an estimated construction value of $417K and approximately 1 square feet (about $416.96K/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

Extending the drive to increase stacking space at student drop-off, regrading front planting bed to drain, regrading around play fields, replace accessible ramp at south ramp at south side of building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
+31d
April 2, 2026
Review Complete
May 3, 2026
Construction Start
June 15, 2026
Expected Completion
March 6, 2027

๐Ÿ“…Project Timeline

Filed

Apr 2, 2026

Review Complete

May 3, 2026

Inspection Complete

Closed

31d

Review duration

Quick Actions

TDLR ID: TABS2026016757

Property Owner

Design Firm

Registered Accessibility Specialist

๐Ÿ“‹
KATHY S,RODRIGUEZ
RAS #1273
7171 HIGHWAY 6 N SUITE 285, HOUSTON, TX 77095
๐Ÿ“Š

Fort Bend County Economy

4.4%
Unemployment
$440K
Median Listing
12,487
Bldg Permits/yr
975K
Population
4,378
Active Listings
$116K
Median Income
Source: FRED ยท Updated May 2026
County projects โ†’

Get alerts for Fort Bend

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists