Spec Office
Spec Office is a renovation/alteration project at 4911 Conflans Rd Suite 100, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2026. The project has an estimated value of $450K across about 77,344 sq ft.
๐Project Metrics
TDLR #TABS2026016893Review Complete
Design review complete, construction may proceed
Spec Office is a Renovation/Alteration project located at 4911 Conflans Rd Suite 100, Irving, TX 75061 in Irving, Texas. The project has an estimated value of $450K covering 77,344 sq ft. AMCRE/AI Conflans Industrial Owner, LP is the property owner and Lo Architecture is the design firm of record. The project was registered with TDLR on April 6, 2026.
โFrequently Asked Questions
What is Spec Office?
Spec Office is a renovation/alteration project at 4911 Conflans Rd Suite 100 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior build-out in an existing shell building
Is Spec Office open in Irving?
Spec Office is still under construction in Irving, TX, with an estimated completion of Sep 2026 according to its TDLR registration.
Where is Spec Office located?
Spec Office is located at 4911 Conflans Rd Suite 100, Irving, TX, 75061, in Dallas County.
Who is the owner or developer of Spec Office?
AMCRE/AI Conflans Industrial Owner, LP is the property owner/developer of record for Spec Office, per its TDLR project registration.
Who is the architect or design firm for Spec Office?
Lo Architecture is the design firm of record for Spec Office, according to its TDLR filing.
How much does Spec Office cost and how big is it?
Spec Office has an estimated construction value of $450K and approximately 77,344 square feet (about $6/sqft), based on its TDLR filing.
๐Scope of Work
interior build-out in an existing shell building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 6, 2026
Review Complete
May 21, 2026
Inspection Complete
Closed
45d
Review duration