Pretty Pilates Studio
Pretty Pilates Studio is a renovation/alteration project at 5115 Meridiana Parkway 400, Manvel, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $65K across about 1,500 sq ft.
๐Project Metrics
TDLR #TABS2026017763Inspection Complete
Final inspection completed, awaiting project closure
Pretty Pilates Studio is a Renovation/Alteration project located at 5115 Meridiana Parkway 400, Manvel, TX 77578 in Manvel, Texas. The project has an estimated value of $65K covering 1,500 sq ft. PDC 2 Meridiana, LLC is the property owner. The project was registered with TDLR on April 15, 2026.
โFrequently Asked Questions
What is Pretty Pilates Studio?
Pretty Pilates Studio is a renovation/alteration project at 5115 Meridiana Parkway 400 in Manvel, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Build out
Is Pretty Pilates Studio open in Manvel?
Construction on Pretty Pilates Studio is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Where is Pretty Pilates Studio located?
Pretty Pilates Studio is located at 5115 Meridiana Parkway 400, Manvel, TX, 77578, in Brazoria County.
Who is the owner or developer of Pretty Pilates Studio?
PDC 2 Meridiana, LLC is the property owner/developer of record for Pretty Pilates Studio, per its TDLR project registration.
How much does Pretty Pilates Studio cost and how big is it?
Pretty Pilates Studio has an estimated construction value of $65K and approximately 1,500 square feet (about $43/sqft), based on its TDLR filing.
๐Scope of Work
Build out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 15, 2026
Review Complete
Apr 29, 2026
Inspection Complete
May 7, 2026
Closed
14d
Review duration
8d
Construction phase