Ranch at Caliterra Amenity Center is a new construction project at Lot 59, Block C The Ranch at Caliterra, Dripping Springs, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $500K across about 1,423 sq ft.
Design review complete, construction may proceed
Ranch at Caliterra Amenity Center is a New Construction project located at Lot 59, Block C The Ranch at Caliterra, Dripping Springs, TX 78620 in Dripping Springs, Texas. The project has an estimated value of $500K covering 1,423 sq ft. CF CSLK CARTER LLC is the property owner and Haddon+Cowan Architects is the design firm of record. The project was registered with TDLR on April 20, 2026.
Ranch at Caliterra Amenity Center is a new construction project at Lot 59, Block C The Ranch at Caliterra in Dripping Springs, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1,423 sf neighborhood amenity center with restrooms, storage, pump room and fitness center.
Ranch at Caliterra Amenity Center is still under construction in Dripping Springs, TX, with an estimated completion of Jan 2027 according to its TDLR registration.
Ranch at Caliterra Amenity Center is located at Lot 59, Block C The Ranch at Caliterra, Dripping Springs, TX, 78620, in Hays County.
CF CSLK CARTER LLC is the property owner/developer of record for Ranch at Caliterra Amenity Center, per its TDLR project registration.
Haddon+Cowan Architects is the design firm of record for Ranch at Caliterra Amenity Center, according to its TDLR filing.
Ranch at Caliterra Amenity Center has an estimated construction value of $500K and approximately 1,423 square feet (about $351/sqft), based on its TDLR filing.
1,423 sf neighborhood amenity center with restrooms, storage, pump room and fitness center.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 20, 2026
Review Complete
May 13, 2026
Inspection Complete
Closed
23d
Review duration
Need a contractor for this project?
Browse verified general contractors active in Hays County
Find General Contractors in Hays