IV nutrition is a renovation/alteration project at 2601 S I-35 Buld C200, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $60K across about 2,400 sq ft.
Design review complete, construction may proceed
IV nutrition is a Renovation/Alteration project located at 2601 S I-35 Buld C200, Round Rock, TX 78664 in Round Rock, Texas. The project has an estimated value of $60K covering 2,400 sq ft. BOARDWALK ROUND ROCK LP is the property owner and Quick CAD drafting and design is the design firm of record. The project was registered with TDLR on April 24, 2026.
IV nutrition is a renovation/alteration project at 2601 S I-35 Buld C200 in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel existing tenant finish
IV nutrition is currently under construction in Round Rock, TX. Its current TDLR status is "Review Complete".
IV nutrition is located at 2601 S I-35 Buld C200, Round Rock, TX, 78664, in Williamson County.
BOARDWALK ROUND ROCK LP is the property owner/developer of record for IV nutrition, per its TDLR project registration.
Quick CAD drafting and design is the design firm of record for IV nutrition, according to its TDLR filing.
IV nutrition has an estimated construction value of $60K and approximately 2,400 square feet (about $25/sqft), based on its TDLR filing.
Remodel existing tenant finish
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 24, 2026
Review Complete
May 13, 2026
Inspection Complete
Closed
19d
Review duration
Building permits found at or near this location
Total demo of SFR 2917 sq ft circa 1947 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2.5 Ton AC System
ETJ New Construction of SFR 3786 SQFT meter installation
Install Irrigation System ETJ
New Construction in the ETJ SFR