GORDON DENTAL
GORDON DENTAL is a renovation/alteration project at 901 S. MOPAC EXPY, BLDG 1, #550, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2026. The project has an estimated value of $600K across about 3,149 sq ft.
๐Project Metrics
TDLR #TABS2026018737Review Complete
Design review complete, construction may proceed
GORDON DENTAL is a Renovation/Alteration project located at 901 S. MOPAC EXPY, BLDG 1, #550, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $600K covering 3,149 sq ft. BARTON OAKS OFFICE CENTER, LLC is the property owner and Studio InnerSpace is the design firm of record. The project was registered with TDLR on April 27, 2026.
โFrequently Asked Questions
What is GORDON DENTAL?
GORDON DENTAL is a renovation/alteration project at 901 S. MOPAC EXPY, BLDG 1, #550 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR REMODEL OF AN EXISTING TENANT SUITE
Is GORDON DENTAL open in Austin?
GORDON DENTAL is still under construction in Austin, TX, with an estimated completion of Oct 2026 according to its TDLR registration.
Where is GORDON DENTAL located?
GORDON DENTAL is located at 901 S. MOPAC EXPY, BLDG 1, #550, Austin, TX, 78746, in Travis County.
Who is the owner or developer of GORDON DENTAL?
BARTON OAKS OFFICE CENTER, LLC is the property owner/developer of record for GORDON DENTAL, per its TDLR project registration.
Who is the architect or design firm for GORDON DENTAL?
Studio InnerSpace is the design firm of record for GORDON DENTAL, according to its TDLR filing.
How much does GORDON DENTAL cost and how big is it?
GORDON DENTAL has an estimated construction value of $600K and approximately 3,149 square feet (about $191/sqft), based on its TDLR filing.
๐Scope of Work
INTERIOR REMODEL OF AN EXISTING TENANT SUITE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 27, 2026
Review Complete
May 13, 2026
Inspection Complete
Closed
16d
Review duration
๐Related Projects
๐๏ธSame Design Firm
$1.1M total๐Related City Permits
Building permits found at or near this location
Verizon proposed fiber installation - boring conduit from ROW to proposed fiber vault/ building entry. No backup batteries or generator proposed.
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Replacement of complete existing central heat and air system with or without duct work
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.