Accton Manufacturing Facility
Accton Manufacturing Facility is a renovation/alteration project at 2947 Executive Blvd., Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $20.0M across about 40,000 sq ft.
๐Project Metrics
TDLR #TABS2026018846Review Complete
Design review complete, construction may proceed
Accton Manufacturing Facility is a Renovation/Alteration project located at 2947 Executive Blvd., Mesquite, TX 75149 in Mesquite, Texas. The project has an estimated value of $20.0M covering 40,000 sq ft. Accton Manufacturing and Service, Inc. is the property owner. The project was registered with TDLR on April 28, 2026.
โFrequently Asked Questions
What is Accton Manufacturing Facility?
Accton Manufacturing Facility is a renovation/alteration project at 2947 Executive Blvd. in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 40,000 gsf of interior renovation for computer server rack production and testing with new toilet rooms and a new elevator.
Is Accton Manufacturing Facility open in Mesquite?
Accton Manufacturing Facility is still under construction in Mesquite, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is Accton Manufacturing Facility located?
Accton Manufacturing Facility is located at 2947 Executive Blvd., Mesquite, TX, 75149, in Dallas County.
Who is the owner or developer of Accton Manufacturing Facility?
Accton Manufacturing and Service, Inc. is the property owner/developer of record for Accton Manufacturing Facility, per its TDLR project registration.
How much does Accton Manufacturing Facility cost and how big is it?
Accton Manufacturing Facility has an estimated construction value of $20.0M and approximately 40,000 square feet (about $500/sqft), based on its TDLR filing.
๐Scope of Work
40,000 gsf of interior renovation for computer server rack production and testing with new toilet rooms and a new elevator.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 28, 2026
Review Complete
May 7, 2026
Inspection Complete
Closed
9d
Review duration