KDL Pathology
KDL Pathology is a renovation/alteration project at 5830 Crescent Dr. Suite 100, Lewisville, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2026. The project has an estimated value of $100K across about 1,200 sq ft.
๐Project Metrics
TDLR #TABS2026018980Review Complete
Design review complete, construction may proceed
KDL Pathology is a Renovation/Alteration project located at 5830 Crescent Dr. Suite 100, Lewisville, TX 75056 in Lewisville, Texas. The project has an estimated value of $100K covering 1,200 sq ft. GID Cascades II LTD is the property owner and Azimuth Architecture, INC is the design firm of record. The project was registered with TDLR on April 29, 2026.
โFrequently Asked Questions
What is KDL Pathology?
KDL Pathology is a renovation/alteration project at 5830 Crescent Dr. Suite 100 in Lewisville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of the suite
Is KDL Pathology open in Lewisville?
KDL Pathology is still under construction in Lewisville, TX, with an estimated completion of Sep 2026 according to its TDLR registration.
Where is KDL Pathology located?
KDL Pathology is located at 5830 Crescent Dr. Suite 100, Lewisville, TX, 75056, in Denton County.
Who is the owner or developer of KDL Pathology?
GID Cascades II LTD is the property owner/developer of record for KDL Pathology, per its TDLR project registration.
Who is the architect or design firm for KDL Pathology?
Azimuth Architecture, INC is the design firm of record for KDL Pathology, according to its TDLR filing.
How much does KDL Pathology cost and how big is it?
KDL Pathology has an estimated construction value of $100K and approximately 1,200 square feet (about $83/sqft), based on its TDLR filing.
๐Scope of Work
Interior remodel of the suite
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 29, 2026
Review Complete
May 15, 2026
Inspection Complete
Closed
16d
Review duration