Terminal Accessibility Loading Zones Improvements - Terminal B Upper Level is a renovation/alteration project at 2400 Aviation Dr, Dfw Airport, TX 75261, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $600K across about 6,200 sq ft.
Project has been registered with TDLR and is in pre-construction phase
Terminal Accessibility Loading Zones Improvements - Terminal B Upper Level is a Renovation/Alteration project located at 2400 Aviation Dr, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $600K covering 6,200 sq ft. City of Dallas/DFW Airport Division is the property owner and RS&H is the design firm of record. The project was registered with TDLR on May 7, 2026.
Terminal Accessibility Loading Zones Improvements - Terminal B Upper Level is a renovation/alteration project at 2400 Aviation Dr, Dfw Airport, TX 75261 in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Install 17 passenger loading zones (~6,200 SF) on the upper level roadways at Terminal B. This includes removing sidewalk to create access aisles and installing parallel curb ramps.
Terminal Accessibility Loading Zones Improvements - Terminal B Upper Level is still under construction in Dfw Airport, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Terminal Accessibility Loading Zones Improvements - Terminal B Upper Level is located at 2400 Aviation Dr, Dfw Airport, TX 75261, Dfw Airport, TX, 75261, in Dallas County.
City of Dallas/DFW Airport Division is the property owner/developer of record for Terminal Accessibility Loading Zones Improvements - Terminal B Upper Level, per its TDLR project registration.
RS&H is the design firm of record for Terminal Accessibility Loading Zones Improvements - Terminal B Upper Level, according to its TDLR filing.
Terminal Accessibility Loading Zones Improvements - Terminal B Upper Level has an estimated construction value of $600K and approximately 6,200 square feet (about $97/sqft), based on its TDLR filing.
Install 17 passenger loading zones (~6,200 SF) on the upper level roadways at Terminal B. This includes removing sidewalk to create access aisles and installing parallel curb ramps.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
May 7, 2026
Review Complete
Inspection Complete
Closed
Active businesses near this construction site
Business data from Google