952.006 Temple HS HVAC Admin Renovation
952.006 Temple HS HVAC Admin Renovation is a renovation/alteration project at 415 N 31st Street, Temple, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2026. The project has an estimated value of $1.9M across about 8,500 sq ft.
๐Project Metrics
TDLR #TABS2026020399Project Registered
Project has been registered with TDLR and is in pre-construction phase
952.006 Temple HS HVAC Admin Renovation is a Renovation/Alteration project located at 415 N 31st Street, Temple, TX 76504 in Temple, Texas. The project has an estimated value of $1.9M covering 8,500 sq ft. Temple ISD is the property owner. The project was registered with TDLR on May 15, 2026.
โFrequently Asked Questions
What is 952.006 Temple HS HVAC Admin Renovation?
952.006 Temple HS HVAC Admin Renovation is a renovation/alteration project at 415 N 31st Street in Temple, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Admin Area of High School is getting the HVAC design changed, new units, new ceiling, and lighting. Also,remodel two restrooms in the student center. Recieving new finishes and fixtures but returning with original layout and function.
Is 952.006 Temple HS HVAC Admin Renovation open in Temple?
952.006 Temple HS HVAC Admin Renovation is still under construction in Temple, TX, with an estimated completion of Jul 2026 according to its TDLR registration.
Where is 952.006 Temple HS HVAC Admin Renovation located?
952.006 Temple HS HVAC Admin Renovation is located at 415 N 31st Street, Temple, TX, 76504, in Bell County.
Who is the owner or developer of 952.006 Temple HS HVAC Admin Renovation?
Temple ISD is the property owner/developer of record for 952.006 Temple HS HVAC Admin Renovation, per its TDLR project registration.
How much does 952.006 Temple HS HVAC Admin Renovation cost and how big is it?
952.006 Temple HS HVAC Admin Renovation has an estimated construction value of $1.9M and approximately 8,500 square feet (about $224/sqft), based on its TDLR filing.
๐Scope of Work
Admin Area of High School is getting the HVAC design changed, new units, new ceiling, and lighting. Also,remodel two restrooms in the student center. Recieving new finishes and fixtures but returning with original layout and function.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 15, 2026
Review Complete
Inspection Complete
Closed