Pioneer Parkway
Pioneer Parkway is a renovation/alteration project at 2333 E. Pioneer Pkwy, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $750K across about 3,131 sq ft.
๐Project Metrics
TDLR #TABS2026020901Project Registered
Project has been registered with TDLR and is in pre-construction phase
Pioneer Parkway is a Renovation/Alteration project located at 2333 E. Pioneer Pkwy, Arlington, TX 76010 in Arlington, Texas. The project has an estimated value of $750K covering 3,131 sq ft. RaceTrac, Inc. is the property owner and GPD Group Professional Corporation is the design firm of record. The project was registered with TDLR on May 21, 2026.
โFrequently Asked Questions
What is Pioneer Parkway?
Pioneer Parkway is a renovation/alteration project at 2333 E. Pioneer Pkwy in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Existing RaceTrac convenience store and associated dumpster enclosure.
Is Pioneer Parkway open in Arlington?
Pioneer Parkway is still under construction in Arlington, TX, with an estimated completion of Jan 2027 according to its TDLR registration.
Where is Pioneer Parkway located?
Pioneer Parkway is located at 2333 E. Pioneer Pkwy, Arlington, TX, 76010, in Tarrant County.
Who is the owner or developer of Pioneer Parkway?
RaceTrac, Inc. is the property owner/developer of record for Pioneer Parkway, per its TDLR project registration.
Who is the architect or design firm for Pioneer Parkway?
GPD Group Professional Corporation is the design firm of record for Pioneer Parkway, according to its TDLR filing.
How much does Pioneer Parkway cost and how big is it?
Pioneer Parkway has an estimated construction value of $750K and approximately 3,131 square feet (about $240/sqft), based on its TDLR filing.
๐Scope of Work
Existing RaceTrac convenience store and associated dumpster enclosure.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 21, 2026
Review Complete
Inspection Complete
Closed