Suite 400 TI buildout
Suite 400 TI buildout is a new construction project at 2709 FM 150 Ste 400, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $110K across about 986 sq ft.
๐Project Metrics
TDLR #TABS2026021112Review Complete
Design review complete, construction may proceed
Suite 400 TI buildout is a New Construction project located at 2709 FM 150 Ste 400, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $110K covering 986 sq ft. 2709 FM 150 LLC is the property owner and KO Design Group LLC is the design firm of record. The project was registered with TDLR on May 23, 2026.
โFrequently Asked Questions
What is Suite 400 TI buildout?
Suite 400 TI buildout is a new construction project at 2709 FM 150 Ste 400 in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior build out of shell building
Is Suite 400 TI buildout open in Kyle?
Suite 400 TI buildout is still under construction in Kyle, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is Suite 400 TI buildout located?
Suite 400 TI buildout is located at 2709 FM 150 Ste 400, Kyle, TX, 78640, in Hays County.
Who is the owner or developer of Suite 400 TI buildout?
2709 FM 150 LLC is the property owner/developer of record for Suite 400 TI buildout, per its TDLR project registration.
Who is the architect or design firm for Suite 400 TI buildout?
KO Design Group LLC is the design firm of record for Suite 400 TI buildout, according to its TDLR filing.
How much does Suite 400 TI buildout cost and how big is it?
Suite 400 TI buildout has an estimated construction value of $110K and approximately 986 square feet (about $112/sqft), based on its TDLR filing.
๐Scope of Work
Interior build out of shell building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 23, 2026
Review Complete
Jun 22, 2026
Inspection Complete
Closed
30d
Review duration
๐Related Projects
๐๏ธSame Design Firm
$9.7M total๐Related City Permits
Building permits found at or near this location
Cap off water & wastewater
Demolition of three warehouse structures approximately 25489 sq. ft. circa 1973. 2025 155974 DA - Approved
Express- Remove and replace 3 windows
New tenant infill for personal training facility in three story multi use building. existing space has fire rated ceiling assembly to remain. Adding gypsum board to two existing walls. Adding accessible restrooms and storage cabinets. STE 110A
New tenant infill for personal training facility in three story multi use building. existing space has fire rated ceiling assembly to remain. Adding gypsum board to two existing walls. Adding accessible restrooms and storage cabinets. STE 110A
Property Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Hays County
Find General Contractors in Hays