Gunster/Zest Law
Gunster/Zest Law is a renovation/alteration project at 13501 Galleria Cir. Suite W 220, Bee Cave, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2026. The project has an estimated value of $75K across about 1,740 sq ft.
๐Project Metrics
TDLR #TABS2026022007Review Complete
Design review complete, construction may proceed
Gunster/Zest Law is a Renovation/Alteration project located at 13501 Galleria Cir. Suite W 220,, Bee Cave, TX 78738 in Bee Cave, Texas. The project has an estimated value of $75K covering 1,740 sq ft. CSHV HCG Office LLC is the property owner and JDai Studio is the design firm of record. The project was registered with TDLR on June 4, 2026.
โFrequently Asked Questions
What is Gunster/Zest Law?
Gunster/Zest Law is a renovation/alteration project at 13501 Galleria Cir. Suite W 220 in Bee Cave, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish out
Is Gunster/Zest Law open in Bee Cave?
Gunster/Zest Law is still under construction in Bee Cave, TX, with an estimated completion of Aug 2026 according to its TDLR registration.
Where is Gunster/Zest Law located?
Gunster/Zest Law is located at 13501 Galleria Cir. Suite W 220, Bee Cave, TX, 78738, in Travis County.
Who is the owner or developer of Gunster/Zest Law?
CSHV HCG Office LLC is the property owner/developer of record for Gunster/Zest Law, per its TDLR project registration.
Who is the architect or design firm for Gunster/Zest Law?
JDai Studio is the design firm of record for Gunster/Zest Law, according to its TDLR filing.
How much does Gunster/Zest Law cost and how big is it?
Gunster/Zest Law has an estimated construction value of $75K and approximately 1,740 square feet (about $43/sqft), based on its TDLR filing.
๐Scope of Work
Finish out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 4, 2026
Review Complete
Jun 22, 2026
Inspection Complete
Closed
18d
Review duration
๐Related Projects
๐๏ธSame Design Firm
$3.5M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater Replace existing electric water heater
Install Irrigation System
Express- Foundation Repair: Installing 27 Exterior & 9 Interior Pilings.
New construction sfr in the etj 1657 sqft
ETJ new service for SFR