The UPS Store
The UPS Store is a renovation/alteration project at 1001 E Hebron Parkway Suite 118, Carrollton, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2026. The project has an estimated value of $70K across about 1,398 sq ft.
๐Project Metrics
TDLR #TABS2026022364Review Complete
Design review complete, construction may proceed
The UPS Store is a Renovation/Alteration project located at 1001 E Hebron Parkway Suite 118, Carrollton, TX 75010 in Carrollton, Texas. The project has an estimated value of $70K covering 1,398 sq ft. P1212 Investments, LLC is the property owner. The project was registered with TDLR on June 9, 2026.
โFrequently Asked Questions
What is The UPS Store?
The UPS Store is a renovation/alteration project at 1001 E Hebron Parkway Suite 118 in Carrollton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovation of a 1,398 SF existing store. SOW includes interior demolition to flooring and installation of new fixtures and finishes.
Is The UPS Store open in Carrollton?
The UPS Store is still under construction in Carrollton, TX, with an estimated completion of Jul 2026 according to its TDLR registration.
Where is The UPS Store located?
The UPS Store is located at 1001 E Hebron Parkway Suite 118, Carrollton, TX, 75010, in Denton County.
Who is the owner or developer of The UPS Store?
P1212 Investments, LLC is the property owner/developer of record for The UPS Store, per its TDLR project registration.
How much does The UPS Store cost and how big is it?
The UPS Store has an estimated construction value of $70K and approximately 1,398 square feet (about $50/sqft), based on its TDLR filing.
๐Scope of Work
Interior Renovation of a 1,398 SF existing store. SOW includes interior demolition to flooring and installation of new fixtures and finishes.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 9, 2026
Review Complete
Jun 27, 2026
Inspection Complete
Closed
18d
Review duration