Methanex
Methanex is a renovation/alteration project at 2800 Post Oak Blvd. Suite 3400, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $2.9M across about 19,607 sq ft.
๐Project Metrics
TDLR #TABS2026025094Project Registered
Project has been registered with TDLR and is in pre-construction phase
Methanex is a Renovation/Alteration project located at 2800 Post Oak Blvd. Suite 3400, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $2.9M covering 19,607 sq ft. Williams Tower, L.P. is the property owner and Abel Design Group is the design firm of record. The project was registered with TDLR on July 13, 2026.
โFrequently Asked Questions
What is Methanex?
Methanex is a renovation/alteration project at 2800 Post Oak Blvd. Suite 3400 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THIS PROJECT CONSISTS OF PRIMARILY AN OPEN OFFICE BUILD-OUT. SCOPE OF WORK INCLUDES OPEN OFFICE AREAS WITH WORKSTATIONS, PRIVATE OFFICES, CONFERENCE ROOMS, STORAGE ROOMS, RECEPTION AREA AND BREAK ROOM.
Is Methanex open in Houston?
Methanex is still under construction in Houston, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is Methanex located?
Methanex is located at 2800 Post Oak Blvd. Suite 3400, Houston, TX, 77056, in Harris County.
Who is the owner or developer of Methanex?
Williams Tower, L.P. is the property owner/developer of record for Methanex, per its TDLR project registration.
Who is the architect or design firm for Methanex?
Abel Design Group is the design firm of record for Methanex, according to its TDLR filing.
How much does Methanex cost and how big is it?
Methanex has an estimated construction value of $2.9M and approximately 19,607 square feet (about $148/sqft), based on its TDLR filing.
๐Scope of Work
THIS PROJECT CONSISTS OF PRIMARILY AN OPEN OFFICE BUILD-OUT. SCOPE OF WORK INCLUDES OPEN OFFICE AREAS WITH WORKSTATIONS, PRIVATE OFFICES, CONFERENCE ROOMS, STORAGE ROOMS, RECEPTION AREA AND BREAK ROOM.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 13, 2026
Review Complete
Inspection Complete
Closed